|
|
Member
Posts: 5
| We own an Exiss XT/306 MT. We carry our field trial dogs in our unfinished mid-tack. Last year when it got bitter cold one weekend, I opened the door from the LQ to let some heat go into the MT. The next morning, it looked like it rained in the mid-tack from condensation. I'd like to finish the mid-tack off with insulation etc. Can anyone recommend a good step-by-step resource manual on finishing off the interior that would cover things like moisture barrier, adhesives, furring strips, insulation, finished wall surfaces, etc.? Thank you. | |
|
|